(A)      Dam, Reservoir, Hydrology, Sedimentology, Spillways, Diversion and Outlet Structures

(a)Main Dam and Reservoir 
Type of DamConcrete Face Rockfill Dam (CFRD)
Dam Height (on foundation)220 m
Dam Body Volume26.7 Mm3
Dam Crest Elevation648.0 masl
Parapet Wall Top Elevation649.5 masl
Dam Crest Length630.0 m
Maximum Normal Water Level (Max. NWL)640.0 masl
Minimum Normal Water Level (Min. NWL)530.0 masl
Total Storage Capacity1,581 Mm³
Live Storage1,342 Mm³
Dead Storage239 Mm³
(b)Hydrology 
Catchment Area (at dam site)3,857 km2
Dudhkoshi River Average Flow209 m3/s
Construction Flood (50-year return period)3,892 m3/s
Design Flood (10,000-year return period)9,027 m3/s
Probable Maximum Flood (PMF)12,638 m3/s
(c)Sedimentology 
Total Sediment Annual Yield8.82 Mm3/year (15 Mt/year)
Total Sediment Volume after 50 years441 Mm³
Dead Storage Loss after 50 years239 Mm³ (100%)
Active Storage Loss after 50 years202 Mm³ (15%)
Average Annual Energy with Sedimentation (50 years)3,331 GWh
Average Dry Season Energy with Sedimentation (50 years)1,204 GWh
Average Wet Season Energy with Sedimentation (50 years)2,127 GWh
(d)Main Spillway 
 (i) Gated Spillway 
TypeConcrete gated
Design Discharge (10,000 year return period)9,027 m³/s
Sill Elevation624.0 masl
Crest Length60.0 m
Radial Gates4 nos, 15.0 m x 20.6 m (width x height)
 (ii) Labyrinth Weir 
TypeLabyrinth Overflow
Design Discharge2,250 m³/s
Crest Elevation640.5 masl
Length56.55 m
(e)Auxiliary/Emergency Spillway 
 (i) Labyrinth Weir 
TypeLabyrinth Overflow
Design Discharge3,700 m³/s
 Crest Elevation644.0 masl
 Length154.5 m
 (ii) Embankment Dam 
 TypeEmbankment Fuse Dam
 Design Discharge7,800 m³/s
 Crest Elevation647.3 masl
Bottom Elevation637.0 masl
 Length154.5 m
(f)Diversion Tunnels (DT) 
Type and NumberHorseshoe-shaped, 2 nos
 Diameter (Excavation)13.9 m (Finished Dia. 12 m)
LengthsDT1 = 1,115.2 m DT2 = 1,289.6 m
Total Design Flow3,892 m³/s (50 years return period)
(g)Bottom Outlet (BO) (one of the Diversion Tunnels will serve as BO during operation)
Type and NumberHorseshoe-shaped, 1 no
Diameter (Excavation)13.9 m
Maximum Discharge2,400 m³/s (120 m gross head)
(h)Low Level Outlet (LLO) 
Type and NumberHorseshoe-shaped, 1 no
Diameter (Excavation)9.6 m
 Length929.3 m
Maximum Discharge1,000 m³/s (120 m gross head)
(i)Middle Level Outlet (MLO) 
Type and NumberHorseshoe-shaped, 1 no
Diameter (Excavation)10.5 m and 13.2 m
 Length695.0 m
Maximum Discharge1,000 m³/s (90 m gross head)

(B)       Main Powerhouse

(a)Headrace Tunnel 
 TypeCircular shaped Concrete Lined
 Diameter (Excavation)9.32 m (with TBM), Finished Dia. 8.3 m
 Length13.2 km
 Design Discharge at Rated Head224.4 m³/s
(b)Surge Shaft 
 Type and NumberCircular, 1 no
 Diameter (Excavation)20 m
 Height221 m
(c)Steel Penstock 
 Type and NumberCircular, 1 no
 Diameter (Internal)6.7 m (3.2 m Dia. in bifurcation)
 Length528.0 m
(d)Vertical Penstock Shaft 
 Type and NumberCircular, 1 no
 Diameter (Excavation)8.5 m
 Length180.0 m
(e)Powerhouse 
 TypeUnderground Powerhouse
 Capacity600 MW (4 x 150 MW)
 TurbineFrancis (Vertical Axis)
 Turbine Rated Head294 m

(C)      Dam Toe Powerhouse

(a)Headrace Tunnel 
 TypeD-Shaped, Concrete Lined
 Diameter (Excavation)8.0 m x 8.0 m
 Length880
 Design Discharge at Rated Head40 m³/s
(b)Surge Shaft 
 NumberCircular, 1 no
 Diameter7.0 m
 Height140.15 m
(c)Steel Penstock 
 Type and numberCircular, 1 no
 Diameter (Internal)2.8 m
 Length186.5 m
(d)Vertical Penstock Shaft 
 Type and numberCircular, 1 no
 Diameter (Excavation)3.6 m
 Length82.5 m
(e)Powerhouse 
 TypeUnderground
 Capacity70 MW (2 x 35 MW)
 TurbineFrancis (Vertical Axis)
 Turbine Rated Head182 m

(D)      Transmission Line and Sub-Stations

(a)Transmission Lines 
 Type and VoltageDouble Circuit, 400 kV
 ConductorACSR Moose (Quad bundle per phase)
 Length from Main Powerhouse substation (Dhitung Substation) to Dhalkebar substation82 km
 Length from Dam Toe substation to Bhadaure substation – LILO1.6 km
(b)Substation/ Switchyard 
 Number3 nos
 Locationone next to Main Powerhouse and the other two are located next to Dam Toe Powerhouse

(E)       Energy, Costs, Economical and Financial Analysis, Implementation Plan

(a)Energy Production 
 Average Annual energy Production3,377 GWh
 Average Dry Season Energy Production1,252 GWh
 Average Wet Season Energy Production2,125 GWh
(b)Costs 
 Total Capital Costs1,593 MUSD
 
 
 
 
 
 
 
 
(e)Project Implementation 
 Construction period7 years