Dudhkoshi Jalvidyut Company Limited (DKJVCL) was established as a subsidiary company of Nepal Electricty Authority (NEA) on 2073/11/20 as per Company Act 2063 for the implementation of the Dudhkoshi Storage Hydroelectric Project (DKSHEP).

DKSHEP is located in the Dudhkoshi River that flows along the border of Khotang and Okhaldungkha Districts of Koshi Province. Dudhkoshi Main Powerhouse and Toe powerhouse will generate 600 MW and 70 MW respectively, with a total installed capacity of 670 MW. The power generated from the project will be connected to the National Grid via about 81 km long 400 kV double circuit Transmission Line up to Dhalkebar Substation The dam site of the project is located at a road distance of about 210 km from Kathmandu towards east and the reservoir will extend up to Solukhumbu District.